Final installation in Poland – March 2018
Starting production
Fanuc R2000iC complete with 7th axis control
Obara axis controlled servo gun with robot controlled tip dresser and water chiller
Fanuc M710iC very long reach MIG welding robot
Kemppi A7 pulsed welding equipment
Loading area with table tilted
Complete frame welded in under 2 minutes
Both robots welding simultaneously
Fanuc M710iC 12L in an automatic torch cleaning cycle
Final few welds done with tilted table